Galvanized welded mesh as plaster layer to be the exterior wall insulation.
With the development of the environment, the environmental protection building energy saving gets important today. The exterior wall thermal insulation technology plays a significant role around our life now. Next we are going to talk about the construction technology to know more about the exterior wall insulation.
Galvanized welded mesh as plaster layer to be the exterior wall insulation.
The wall insulation construction is reinforced with plaster steel mesh.
The exterior wall thermal insulation demands
Thermal insulation: the thickness for the exterior wall thermal insulation, the interface agent: 2–3 mm, the waterproof mortar: 5 mm. The YQBW high quality thermal insulation mortar: 25 mm in the direction of east, west and south, and 30 mm in the direction of north. The thickness of the anti-cracking protection layer for decoration coating system is 10 mm. Galvanized steel mesh and insulation anchor is installed on the middle.
The exterior wall thermal insulation system structure
The material
The interface processing: YQ-V interface processing agent.
We can add water into the interface agent and mix them when we need interface mortar to coat the wall. The mixing time should be more than 3 minutes. The proportion of the water and cement is based on the actual construction. The interface mortar mixed with water should be run out within 4 hours.
The waterproof: the thickness of the waterproof mortar is 5 mm.
The proportion of the mortar, water: cement = 1: 2. There is 5% waterproof agent in it. The mixing time should be more than 5 minutes.
The material of the thermal insulation: YQBW high quality thermal insulation mortar.
The mixing time should be more than 5 minutes. The proportion, water: mortar = 0.3: 1. We can add the water as mush as we need and mix it. We should mix the mortar only when we need it. The interface mortar mixed with water should be run out within 4 hours.
The protection material: YQKS anti-cracking mortar.
The configuration standard for the anti-cracking mortar with anti-cracking agent is like the following:
Steel mesh.
Specification: the mesh opening: 12.7 × 12.7 mm, the wire diameter: 0.9 ± 0.04 mm.
Insulation anchor:
The tensile strength of the anchor is more than 0.8 KN.
The base wall cleaning
The base wall processing.
The wall construction
The construction condition
Repair for the pipe hole before plastering and inspect the position of the window and door. Inspect for the interface when the plaster cake is ready. The part that is more than the thickness of the insulation should be handled with with cement mortar so that the wall is on the same level. It is not the best construction time when the temperature is more than 35℃ or it's less than 5℃ for twenty four hours. We construct during during rainy days only when there is the waterproof measure. There should be antifreezing measure when it’s winter and sunscreen measures for summer. We can also put a sunscreen cloth on the scaffold if necessary.
The construction technology
clog the gap for YQBW exterior wall insulation, clean the wall, install the plastering cake and steel, install the insulation control line, water the wall, coat the interface agent, coat the waterproof mortar, coat the insulation material for the first time, coat the insulation for the second time, test the flatness and the thickness, install the galvanized steel mesh, water the wall, plaster the anti-cracking mortar, conserve with water, and acceptance.
The points for construction.
Transport and storage
We should pay attention to the waterproof problem when we transport and storage the YQBW high quality insulation mortar and YQKS anti-cracking mortar. And its usage time should not be more than three months.
The notice details